InvocketGet the app

Concrete

Concrete invoice & estimate app

Homeowners, landlords, property managers, businesses, and general contractors pay for concrete work. Small crews usually sell a defined scope, such as a driveway or patio, with dimensions and finish in a written estimate. A deposit may fund material ordering and pump booking; larger jobs use progress invoices, with the final balance due after placement and finishing. Commercial work follows the GC’s agreed billing cycle.

In short

Invocket lets concrete businesses write estimates on site, turn accepted ones into invoices, mark them paid and see who still owes what, all on the iPhone and without signal. Estimate with AI drafts the line items from a description.

On this page

What a concrete job bills like

These are the lines a concrete estimate usually carries. In Invocket each one is a line item with a quantity and a price, and you can group them into sections with their own subtotals:

  • Concrete, per cubic yard
  • Forms & rebar
  • Pump truck
  • Broom or stamped finish
The Estimates tab in Invocket on iPhone.
Estimates and invoices on one phone
Everything is stored on the iPhone, so it works on a roof, in a basement or anywhere else with no signal.

How concrete jobs are priced and paid

Choose units that match the work. Ready-mixed concrete is sold by volume in cubic yards, according to NRMCA, Concrete in Practice 31. For a slab or footing, multiply length, width, and depth in feet, then divide cubic feet by 27 to get cubic yards. NRMCA advises avoiding excessive orders and small clean-up loads. Square feet suit flatwork comparisons; linear feet fit curbs and narrow runs; each works for steps or defined small features. Price labor as a fixed scope or list tasks separately.

Separate mix, preparation, forms, reinforcement, pumping, and finishing on the estimate. State dimensions, thickness, finish, access assumptions, and who handles excavation or disposal. Describe the mix and estimated yards, and note included edges or cut layout. A concrete estimate template can help organize those scope details.

Line itemPriced byWhat to write on the estimate
Ready-mixCubic yardMix, estimated yards, placement area
Excavation and baseSquare foot, cubic yard, or scopeDig depth, base, disposal included
Forms and reinforcingLinear foot, square foot, or scopeLayout, bar or mesh, included edges
Pump and setupBooking or agreed timeAccess, setup, waiting terms
Placement and finishSquare foot or scopeBroom, smooth, exposed, or stamped
Saw cuts and cleanupLinear foot or scopeCut layout, cleanup, haul-away

For a short residential job, collect an agreed deposit before ordering mix or reserving a pump. Invoice the balance after placement and finishing. On multi-stage work, tie progress invoices to named milestones, such as completed base preparation and then placement. For a GC or commercial customer, agree on billing dates, required backup, payment terms, and any retainage before starting. Match invoices to approved scope, signed changes, tickets, and completed stages. Check your state and local rules for deposit limits and contract terms.

The documents a concrete job produces

Concrete estimate
Before scheduling, list dimensions, estimated yards, mix, base, forms, reinforcement, pump, finish, exclusions, access assumptions, and planned deposit and billing milestones.
Deposit receipt
Record amount, date, payment method, job address, and whether funds apply to material ordering or pump booking. Show the remaining estimated balance.
Ready-mix delivery tickets
Keep each supplier ticket with date, mix, delivered quantity, and job location. Compare tickets with the estimate and placement before billing added yards.
Pour change order
Get approval for changed dimensions, depth, reinforcement, finish, access, or pump time. Show added scope, pricing basis, schedule effect, and approval.
Progress and final invoice
Bill completed stages on larger work. The final invoice shows quantities, line items, payments credited, requested tickets, and the remaining balance.

What makes billing concrete work harder

Estimating uneven ground

A plan view misses dips, slopes, thickened edges, and subgrade changes. Measure sections and state assumed depth and base condition. If excavation exposes soft spots or the customer requests a thicker section, document revised quantity and scope before ordering more mix. This record explains why actual yards differ from the takeoff and supports a change to the estimate before the pour.

Reconciling load tickets

Loads may serve different placements, and delivered quantity can differ from what a customer expects to see installed. Keep each ticket with the job file, note the area served, and reconcile quantities before invoicing. Explain excess, short loads, or clean-up loads in writing. NRMCA advises avoiding excessive orders and small clean-up loads, so check measurements and the planned order before dispatch.

Coordinating the pour

The ready-mix slot, pump, crew, and site access must line up. Incomplete forms, blocked access, or another trade can create waiting and affect booked equipment. Put site-readiness duties and any agreed waiting or cancellation charge in the estimate. Record arrival time, delay reason, notification, and customer direction before adding a charge. These notes connect the bill to what happened on site.

Dispute: More yards billed than expected

A customer may question extra concrete when the final shape or depth differs from the estimate. Document measured area, assumed depth, and who approves added quantity before pouring. Keep tickets and note which placement each load served. If challenged, send the estimate, approved change, and ticket reconciliation together. Correct any quantity you cannot support, and explain documented differences plainly.

Dispute: Finish differs from expectation

Customers may object to broom direction, color, stamp pattern, edges, or surface appearance after the concrete sets. Put the selected finish, reference, limits, and care instructions in the approved scope. Photograph the reference and completed work. If challenged, record the specific area and concern, inspect it with the customer, and write down any agreed repair or closeout rather than relying on a verbal promise.

Weather and the concrete pour season

Rain, freezing conditions, and extreme heat can change whether a pour proceeds and how the crew protects and finishes it. Tell the customer when weather shifts the date, and record rescheduling or added protection in the job file. In colder regions, outdoor flatwork may slow in winter, with more estimates and bookings in milder periods. Timing still depends on local conditions, site access, and placement type, so confirm the site and forecast before promising a date.

Concrete invoicing FAQs

How do I estimate concrete for a slab?

Measure length, width, and thickness in feet. Multiply for cubic feet and divide by 27 for cubic yards; NRMCA, Concrete in Practice 31, gives 27 cubic feet per cubic yard. List base, forms, reinforcement, pumping, and finish separately, and state the assumed depth.

Quote concrete by yard or square foot?

Ready-mixed concrete is sold by cubic yard, according to NRMCA, Concrete in Practice 31. Square feet can describe flatwork for comparison, while linear feet suit curbs or narrow runs. Name the unit and included tasks on each line so customers can compare the scope.

What should a concrete deposit cover?

Say what the deposit applies to, such as ordering ready-mix or reserving a pump and crew date. Show it separately and state when the balance or next progress payment is due. Deposit rules and contract requirements vary, so check your state and local rules before setting terms.

How do I bill extra concrete or finish changes?

Write a change order before extra work when possible. Describe revised dimensions, quantity, finish, or equipment time, then show the pricing unit, price, and schedule effect. Get approval in writing and keep delivery tickets with the final invoice to support the added amount.

What paperwork goes with a concrete invoice?

Reflect the approved estimate and change orders in the invoice lines. Attach delivery tickets when they support billed yards, plus progress details or backup requested by the customer or GC. Show deposits and prior payments as credits, identify completed work, and issue a receipt after payment.

Does Invocket work for concrete businesses of one?

Yes, it is built for them. There is no seat pricing, no crew scheduling and no account to create; the app opens straight into an empty ledger on your iPhone.

Can I send a concrete estimate and turn it into an invoice?

Yes. Estimates have their own numbering. When the customer accepts, mark the estimate Accepted and convert it: a new invoice opens with the client, line items, sections, VAT and payment details already filled in, and you save it.

Does it work without a signal?

Yes. Documents are written to the phone, so creating, editing, rendering the PDF and marking an invoice paid all work with no connection. You need a signal to email the file and to use Estimate with AI.

About this page

Invocket Editorial

Written by the team that builds Invocket, an invoicing app for contractors. We check prices and rules against published sources, name them on the page, and update the page when they change. How we write and check these pages.

Keep going

Bill the job before you leave the driveway

No account to create, nothing to set up. Open the app and write the first estimate.

Get Invocket for iPhone