Free estimate template
Concrete estimate template
A concrete estimate should show how the pour dimensions and slab thickness turn into a cubic-yard quantity. It should also separate forms and rebar, the pump truck, and the selected finish so the customer can see what each part of the pour covers.
What belongs on an estimate for concrete work
- Pour area, slab thickness, and calculated concrete volume in cubic yards
- Concrete mix or strength specification from the plans or agreed scope
- Form setting and rebar placement
- Pump truck setup as a separate line when the pour needs one
- Finish type, such as broom or stamped, and the area it covers
- Site access or preparation details that could affect the pour, such as a narrow path to the slab
How concrete work is priced
Ready-mix concrete is usually estimated by cubic yard, based on the pour area and thickness, with an allowance for the actual site and placement. Forms and rebar may be priced by measured quantities or as a job line, while a pump truck is commonly listed as its own job charge. Broom finish is often measured by square footage, while stamped work should identify the area and the finish scope.
Tax, deposits and terms
Keep ready-mix concrete and reinforcing steel separate from forming, placement, and finishing labor when your tax records or local rules call for that breakdown. Tax treatment varies by state, so check your state and use the categories your tax preparer advises. A deposit can cover ordering the mix and reserving the pump truck; state when the remaining balance is due, such as after the pour and finish are complete. For a larger pour completed in stages, list the deposit and each payment milestone on the estimate.
A worked example
Example estimate for a 20-by-30-foot patio slab, 6 inches thick, with a broom finish. Amounts are illustrative, not market rates.
| Line item | Qty | Unit | Why it is billed that way |
|---|---|---|---|
| Ready-mix concrete | 12 | cubic yd | Example line total: $1,800, including allowance for the calculated volume. |
| Forms and rebar | 1 | job | Example line total: $900 for setting the patio forms and placing rebar. |
| Pump truck | 1 | job | Example line total: $700, shown separately from the concrete. |
| Broom finish | 600 | sq ft | Example line total: $600 for the patio surface. |
Three mistakes on concrete estimates
Leaving out slab thickness
A square-foot quantity alone does not show how many cubic yards the slab needs. State the thickness used for the volume calculation so the customer can check the concrete quantity.
Burying the pump charge
Including the pump truck inside the concrete line can hide a separate cost the customer needs to approve. Show the pump as its own line and note if access or setup could change the plan.
Naming a finish without its area
Writing only “stamped finish” does not show how much concrete gets that finish. List the area and identify the finish scope so a change to the pour size does not leave the finish charge unclear.
Concrete estimate questions
How do I estimate concrete yards for a slab?
Multiply the slab length by its width and thickness using the same units, then convert the volume to cubic yards. Check the dimensions and thickness against the site or plans, and account for the placement conditions when setting the order quantity.
Should I list the pump truck separately on a concrete estimate?
Yes, if the pour needs a pump, give it its own line so the customer can see that charge apart from the ready-mix concrete. Note any access or setup conditions that affect whether the pump can reach the forms.
How should I show a stamped concrete finish on an estimate?
List the area receiving the stamped finish and describe the finish scope, including the agreed pattern or color if known. Keep it separate from the concrete volume and from any other surface finish work.