InvocketGet the app

Carpentry

Carpentry invoice & estimate app

Carpentry work is paid for by homeowners, landlords, property managers, general contractors, and businesses. You may sell a repair by the hour, price trim by measured length, or quote a defined framing or installation scope as a fixed job. Money usually moves as a materials deposit, progress payment at an agreed stage, then the balance after completion; commercial work may follow the customer’s draw and invoice terms.

In short

Invocket lets carpentry businesses write estimates on site, turn accepted ones into invoices, mark them paid and see who still owes what, all on the iPhone and without signal. Estimate with AI drafts the line items from a description.

On this page

What a carpentry job bills like

These are the lines a carpentry estimate usually carries. In Invocket each one is a line item with a quantity and a price, and you can group them into sections with their own subtotals:

  • Labor, per hour
  • Trim, per linear foot
  • Door hang, each
  • Lumber & fasteners
The Estimates tab in Invocket on iPhone.
Estimates and invoices on one phone
Everything is stored on the iPhone, so it works on a roof, in a basement or anywhere else with no signal.

How carpentry jobs are priced and paid

Match the price basis to what you can measure. Hourly billing fits repairs and concealed conditions; state the rate, minimum visit, and material terms. A fixed price fits a defined scope with known dimensions and finish choices. Trim can be priced by linear foot when profile and corners are counted; doors by opening when hanging and hardware are clear. Framing may be a fixed phase, with labor and material split out.

Identify each room, elevation, quantity, material grade or profile, finish, and exclusion. List delivery, removal, hardware, protection, and patching when they apply. If materials are cost plus markup, state the basis before ordering. Keep receipts and the cut list with the job file when field dimensions change the order.

Line itemPriced byWhat to write on the estimate
Framing laborFixed phase or hoursArea, members, layout, fastening included
Lumber and sheet goodsQuantity, cost, or allowanceGrade, dimensions, count, delivery, markup basis
Baseboard or casingLinear footProfile, length, corners, returns, finish
Interior door hangingPer openingDoor, jamb, hardware, shimming, casing
Cabinet or built-in installUnit, run, or fixed scopeUnits, scribe work, fastening, supplied-by
Repair or punch workHourly or fixed taskLocation, labor, minimum, material handling
Demolition and haul-offFixed scope or loadItems, protection, disposal, exclusions

A common schedule is a deposit before ordering special lumber, doors, or cabinets, a progress invoice at a named framing or installation stage, and a final invoice after agreed punch-list work. Tie payments to completed scope. For commercial customers, confirm the billing cutoff, backup, approval path, and terms before mobilizing; send receipts, field tickets, or signed changes as requested. Price and approve added work in writing before proceeding, then bill it with the next agreed draw.

The documents a carpentry job produces

Carpentry estimate
Send before ordering or scheduling. Identify rooms, openings, quantities, labor and material basis, finish assumptions, exclusions, deposit, progress milestones, and final payment point so the customer can check the agreed scope.
Materials deposit invoice
Request the agreed deposit when special-order doors, lumber, or cabinet parts must be purchased. Name the materials or estimate line covered, show the job credit, and keep the supplier receipt with the project records.
Carpentry change order
Record added work before doing it, such as rebuilding an opening or replacing concealed rot. Describe location, labor, materials, price basis, schedule effect, and approval; attach photos or a supplier quote when useful.
Framing progress invoice
Bill at the estimate’s named framing stage or project draw. State completed area or scope, prior payments, included materials, and approved changes; attach field tickets or receipts requested by the general contractor.
Carpentry final invoice and receipt
List completed trim, door, framing, and approved extras, then credit deposits and progress payments. After payment, provide a receipt with amount, date, payment method, and any remaining balance.

What makes billing carpentry work harder

Material takeoffs meet real framing

Field cuts, damaged stock, blocking, and revised openings can change a takeoff made from plans. Keep supplier receipts and note where added stock went instead of folding purchases into one lumber line. Separate material from labor and state whether the customer pays supplier cost or an agreed markup. If a substitution changes grade, size, or finish, record approval before ordering so the invoice matches installed material.

Finish details hide labor

A linear-foot trim rate is clear on a straight wall but less so around returns, corners, stair angles, or uneven walls. Door work can grow when jambs are out of plumb or casing meets old plaster. Define what each unit includes: cuts, joints, shimming, hardware, caulk, and paint or stain. Photograph unusual conditions before covering them and get approval for work outside the estimate.

Several price bases share one job

A remodel may combine a fixed built-in, hourly repair, per-opening doors, and trim by the foot. A lump sum is hard to reconcile when one area is delayed or a finish changes. Give each scope its own line, quantity or unit, rate, and completion point. Keep estimates, revisions, delivery slips, and progress invoices together so a GC or property manager can match billed work to a project draw.

Dispute: Added work was not approved

A customer may treat concealed rot repair or reframing as part of the original price. Name exclusions and likely hidden conditions in the estimate. Pause to send a change order with location, photos, labor, materials, price, and schedule effect; get written approval before continuing when practical. If challenged later, show the original scope beside dated approval and the work record, rather than adding an unexplained charge.

Dispute: The finish or fit is not accepted

A customer may hold final payment over a rubbing door, uneven reveals, trim gaps, or an unexpected finish. Record door swing, hardware, trim profile, finish responsibility, and acceptance points in the estimate; photograph existing conditions. At walkthrough, list each punch item and completion status. Invoice agreed scope clearly, separate disputed items, and retain dated photos and customer sign-off with final paperwork.

How weather and project schedules affect carpentry cash flow

Exterior framing can pause in wet, cold, or windy conditions, while interior trim, doors, and built-ins may continue if the site is ready. Remodel work depends on other trades finishing rough-ins, drywall, or flooring. Put weather delays, site access, material lead time, and payment milestones in the scope. If a GC draw slips or a room is not ready, document completed work and stored materials, then confirm a revised start and billing date in writing.

Carpentry invoicing FAQs

How do I write an estimate for a carpentry job?

Break work into locations and tasks, then show quantity and price basis: hours, linear feet, openings, units, or fixed scope. List material grade or finish, who supplies it, exclusions, disposal, and payment points. Describe how hidden conditions or changed selections will be approved and priced.

Should I charge carpentry by the hour or by the job?

Use hourly pricing when a repair’s condition or scope is hard to inspect before opening it. Fixed pricing suits confirmed dimensions, materials, and finish choices. A unit price works for repeatable trim or doors when you define included cuts, fitting, hardware, and cleanup.

How much deposit should I ask for on a carpentry job?

Set a deposit against the agreed initial commitment, such as special-order doors or lumber, and write what it covers. State when the remainder is due. Check your state and local rules for any limits or required contract language, and avoid requesting payment for undescribed work.

How should I bill for a carpentry change order?

Describe the added location and task, why it is outside the estimate, labor and material basis, price, and schedule effect. Include a photo, measurement, or supplier quote when useful. Get written approval from the customer or authorized GC contact before proceeding, then list the approved change on an invoice.

What paperwork should I send with a carpentry progress invoice?

Reference the estimate or schedule, completed framing or installation milestone, prior payments, and approved changes. Attach receipts, delivery slips, field tickets, or photos if required. For work covered by EPA’s RRP Rule, follow its certification, lead-safe work, and Renovate Right pamphlet requirements; check state and local rules.

Does Invocket work for carpentry businesses of one?

Yes, it is built for them. There is no seat pricing, no crew scheduling and no account to create; the app opens straight into an empty ledger on your iPhone.

Can I send a carpentry estimate and turn it into an invoice?

Yes. Estimates have their own numbering. When the customer accepts, mark the estimate Accepted and convert it: a new invoice opens with the client, line items, sections, VAT and payment details already filled in, and you save it.

Does it work without a signal?

Yes. Documents are written to the phone, so creating, editing, rendering the PDF and marking an invoice paid all work with no connection. You need a signal to email the file and to use Estimate with AI.

About this page

Invocket Editorial

Written by the team that builds Invocket, an invoicing app for contractors. We check prices and rules against published sources, name them on the page, and update the page when they change. How we write and check these pages.

Keep going

Bill the job before you leave the driveway

No account to create, nothing to set up. Open the app and write the first estimate.

Get Invocket for iPhone