InvocketGet the app

Free invoice template

Carpentry invoice template

A carpentry invoice should separate framing hours, trim footage, door hangs, and lumber so the customer can see how each part of the job was billed. It should also identify the openings, rooms, or built-ins where the work was done, not just say carpentry labor.

What belongs on an invoice for carpentry work

  • Framing labor hours and the wall or opening worked on
  • Trim type and installed linear footage, such as baseboard or casing
  • Door hangs by count, with the opening or room identified
  • Lumber dimensions and quantities used for the framing or built-in
  • Fasteners and hardware listed separately from lumber when billed separately
  • Change work, such as a resized opening or added blocking, described by location

How carpentry work is priced

Bill carpentry labor by the hour when time varies, and identify the framing or finish task covered. Measure trim in linear feet, count door hangs by opening, and list lumber and fasteners by quantity or as a material line billed at cost plus markup. Treat each built-in, repair, or other defined scope as its own job line when it is priced as a whole.

Tax, deposits and terms

Show carpentry labor separately from lumber, trim, and hardware so the taxable parts can be handled under your state rules. Tax treatment varies by state, so check your state before deciding whether labor or materials are taxable. For special-order doors, millwork, or custom-cut lumber, set a deposit tied to the material order, then state when the remaining balance is due, such as after installation or completion.

A worked example

Example only, not a rate quote: framing, casing, and hanging two interior doors.

Line itemQtyUnitWhy it is billed that way
Framing labor for two interior door openings, $72012hrHours spent laying out and framing both openings.
Casing trim, $28056lfInstalled footage measured across both door openings.
Interior door hang, $3602eachOne charge for fitting and hanging each door.
Lumber and fasteners, cost plus markup, $1801lotMaterials used to frame the openings, with quantities supported by the material record.

Three mistakes on carpentry invoices

Unclear trim footage

Listing a trim total without naming the trim type or where it was installed makes it hard to check the footage. Record the installed linear feet by room or run, and note separately if extra material was purchased for cuts or waste.

Door hang scope is vague

Billing only for a door hang can leave the customer unsure whether fitting, hardware, and adjustments were included. Name the opening and list any separately billed latch, hinge, or jamb work.

Materials hide the markup

Combining lumber and fasteners into a single unexplained charge can make it difficult to match the bill to the framing work. List the material quantities and show how the cost plus markup was applied.

Carpentry invoice questions

How do I invoice carpentry labor and lumber separately?

Put framing or finish labor on its own line with the hours and task. List lumber, trim, and hardware on material lines with quantities, then show the markup basis for materials billed at cost plus markup.

Should I bill trim by the linear foot or by the hour?

Use linear feet when the trim run can be measured clearly, and name the trim type and location. Use labor hours when fitting, scribing, or repairing the trim makes footage alone a poor record of the work.

How should I list a door hang on a carpentry invoice?

Count each opening and identify the room or door location. State whether the line covers fitting and hanging only, or also includes the jamb, hinges, latch, or adjustments.

Or skip the template

Invocket numbers the document, remembers the customer, renders the PDF on the phone and tracks whether it was paid, offline, with no account. The template is here for the jobs where a one-off file is genuinely faster.

Bill the job before you leave the driveway

No account to create, nothing to set up. Open the app and write the first estimate.

Get Invocket for iPhone