To calculate overhead for contractors, total 12 months of costs not tied to one job, such as your truck, insurance, phone, software, office, tools, and unbilled business time. Divide that amount by the billable hours you sell in a year, or by your annual direct costs. Add the resulting overhead allocation to every job and update it when costs or hours change.
What counts as overhead (and what does not)
Overhead keeps your business ready to work, whether or not one particular job uses it. A tool used for one installation belongs on that job; a general tool kit used across many calls is usually overhead.
Choose a consistent method for your estimate and bookkeeping. The overhead definition distinguishes overhead from direct job costs. Classify each item by how you use it.
| Item | Classification | Why |
|---|---|---|
| Truck payment or lease | Overhead | Supports the business across many jobs. |
| Fuel for general driving | Overhead | Covers estimates, supply runs, and multiple jobs. |
| Fuel for a dedicated job trip | Direct cost | Assign it to the job if you track it separately. |
| General liability insurance | Overhead | Protects the business, not one task. |
| Vehicle insurance | Overhead | Supports a truck used across the business. |
| Phone and estimating software | Overhead | Used for administration and many jobs. |
| Fasteners bought for one project | Direct cost | List them with that job’s materials. |
| Materials left at the job | Direct cost | Consumed by that job. |
| Replacement drill bits for the shop kit | Overhead | General replacement supplies serve many jobs. |
| Rental lift for one installation | Direct cost | Specific to the work requiring it. |
| Bookkeeping and accounting | Overhead | Keeps business records. |
| Permit or inspection charge for one job | Direct cost | Assign it to the specific project. |
| Owner’s time measuring a job | Direct cost or overhead | Charge it to the job if tracked there; otherwise count unbilled estimating time in overhead. |
| Owner’s time on invoices and scheduling | Overhead | Supports the business, not installation work. |
Split costs when needed. Exclude personal truck use, and never count one expense as both overhead and a direct cost.
Step 1: List 12 months of overhead costs
Use a full year, not one month. Pull figures from statements, invoices, receipts, and your profit and loss statement. Include recurring and irregular expenses.
- List recurring costs: vehicle payment, insurance, phone, subscriptions, storage, and bookkeeping.
- Add annual costs such as licenses, tool replacement, advertising, and equipment service.
- Include expected costs not yet paid, based on your records or a quote.
- Put installation hours in labor. Put estimating, scheduling, invoicing, and other unbilled work in overhead unless you charge those hours to jobs.
- Remove personal spending, loan principal for items treated elsewhere in your accounting, and job costs already listed as direct. Ask your bookkeeper about unclear classifications.
Handle owner compensation once. If owner pay is in the labor rate, don’t count that pay again as overhead. If it isn’t in labor, include it somewhere in the cost plan or jobs may look profitable while underpaying the owner.
Taxes and financing charges can be classified differently depending on your accounting method. Confirm their treatment with your tax professional and keep it consistent.
Step 2: Count your real billable hours
Paid or available hours aren’t automatically hours customers pay for. Driving between jobs, estimates, parts orders, calls, invoicing, weather delays, and holidays take time. Build your calculation from your actual work schedule.
Start with work weeks and hours, then subtract time unavailable for customer work. A one-person shop might count 50 weeks x 40 hours = 2,000 paid hours. If 30% goes to driving, estimates, and administration, then 2,000 x 70% = 1,400 billable hours. Recover overhead from the hours you can sell, not all 2,000.
The 30% is an example, not a trade benchmark. Review your calendar and time records from busy and slow periods. Label time as on-site labor, travel, estimating, purchasing, callbacks, bookkeeping, or unavailable. If you charge travel separately, decide whether that line recovers the travel cost or whether travel stays in overhead. Don’t recover it twice.
For employees, hours paid aren’t automatically hours sold. Account for training, paid leave, schedule gaps, and support time. Track billable hours by worker when their schedules differ. If records are thin, estimate carefully, then compare estimated and actual hours monthly and adjust the rate when they diverge.
Step 3: Choose how to spread it
Pick a method that fits how you sell work and what records you keep. Use it consistently and make each job carry its share of annual overhead.
| Method | Calculation | Good fit | Watch for |
|---|---|---|---|
| Per billable hour | Annual overhead divided by annual billable hours | Labor-heavy work where you estimate job hours | A short job may still use substantial vehicle, setup, or admin time. |
| Percent of direct costs | Annual overhead divided by annual direct costs | Work with reliable labor and materials costs | Material-heavy jobs may get a large allocation despite using little overhead. |
| Percent of revenue | Annual overhead divided by annual sales revenue | A business with reliable sales records and a consistent work mix | Revenue includes costs and profit, so this isn’t a markup on cost. |
For the hourly method, multiply estimated hours by overhead per hour. The direct-cost method fits estimates built from labor and materials. Calculate your rate from your own totals, not another contractor’s assumed overhead rate.
A revenue percentage compares overhead with sales, but takes more care to translate into a job price. Check the math on a sample job and add profit separately. Use an hourly rate calculator to organize inputs, then verify them against your records.
Worked example: a one-truck handyman business
Suppose a handyman runs one truck and handles small repairs. These annual costs value unbilled admin time at $0 because owner pay is already in the labor rate. If owner pay isn’t included there, adjust the example rather than copying the zero.
| Annual overhead item | Amount |
|---|---|
| Truck payment and fuel | $9,600 |
| Insurance, general liability and vehicle | $4,800 |
| Phone and software | $1,500 |
| Tools and replacement | $2,400 |
| Marketing | $3,000 |
| Accounting and licenses | $1,800 |
| Small office and storage | $3,600 |
| Owner’s unbilled admin time, pay included in labor rate | $0 |
| Total annual overhead | $26,700 |
Count 50 weeks x 40 hours = 2,000 paid hours. With 30% lost to driving, estimates, and admin, 70% remains billable: 2,000 x 0.70 = 1,400 hours. Divide $26,700 by 1,400: overhead is $19.0714 per billable hour, or $19.07 rounded.
For a six-hour job, labor is 6 x $45 = $270. The rate includes owner pay and any labor burden the business chooses to include. Add $180 materials: direct cost is $270 + $180 = $450. Overhead is 6 x $19.0714 = $114.43 rounded to cents. Job cost with overhead is $450 + $114.43 = $564.43.
For a 25% margin, divide cost by 1 minus the margin: $564.43 / 0.75 = $752.5733, or $752.57. A $755 quote gives slightly more than 25% margin on these inputs. Adding 25% to cost calculates markup, not margin, and yields a lower margin. Check the distinction with a markup and margin calculator.
With annual direct costs of $89,000, the direct-cost method gives $26,700 / $89,000 = 0.30, or 30.0%. Applied to the sample job’s $450 direct cost, it assigns $135 overhead. That differs from the hourly allocation of $114.43 because the methods spread costs differently. Don’t apply both to one estimate.
Adding overhead to a job price
List direct labor, materials, rentals, subcontractors, and other job-specific costs. Add overhead using one method, then add planned profit. The guide to how to price a job covers the full estimate from scope through quote.
- Estimate work hours, including job setup and cleanup.
- Multiply hours by overhead per hour, or apply your selected percentage to its direct-cost base.
- Add direct costs and overhead to get the job’s cost for pricing.
- Set a price that includes planned profit and matches the quoted scope.
- After the job, compare estimated hours and costs with actuals. Record the differences for future estimates.
List identifiable expenses rather than hiding them in a generic allowance. Include a rental, disposal charge, special-order material, or second trip in the scope and cost calculation. State what the quote covers and excludes.
Check labor inputs with a labor cost calculator and review the estimate with a job profit and margin calculator. For fixed-price work, compare the price with an hourly estimate; see flat-rate versus hourly pricing.
Calculate your break-even point to see how much work must sell before profit begins under your assumptions. A handyman rates guide offers context for a quote, but your own costs and scope set your price.
Overhead vs profit
Overhead pays to keep the business running. Profit remains after direct costs and overhead are covered. Recovering truck, insurance, and office costs doesn’t mean the job earned profit.
You may hear a “10 and 10” rule of thumb for overhead and profit in construction. It’s common talk, not a standard or a replacement for your numbers. Your overhead depends on business costs and the billable hours or sales that carry them. Another contractor’s percentage may leave you short.
Gross profit and net profit mark different points in the calculation. Review those figures with overhead in your records; a markup on one estimate doesn’t prove the business is profitable.
When to recalculate
Recalculate when costs or available work hours change. A new truck adds payment, insurance, and maintenance costs. A hire changes payroll, supervision, and hours for sale. A slow season can cut billable hours while fixed costs stay steady, raising overhead per sold hour.
Update the calculation after supplier or service price increases, subscription changes, or a shift in your work mix. More estimating, travel, or admin can make the old billable-hour count inaccurate. If you now spend every Friday on estimates, those hours come out of the billable count, and the overhead rate per sold hour goes up.
- Date each overhead list and record its assumptions.
- Compare forecast hours with actual billable hours regularly.
- Compare recorded costs with actual payments, including irregular annual items.
- Check that no cost is counted as both overhead and a job cost.
- Review completed jobs to see whether the allocation covered its share.
If prices don’t cover costs, review costs, schedule, scope, and price. Keep estimates and actual results to check whether your changes recover costs.
FAQ
What is overhead in construction?
Overhead is the cost of operating a business that isn’t assigned to one specific job. Examples include insurance, vehicle costs, office expenses, software, and unbilled administration. Classify costs by use and tracking method.
How much overhead should I charge?
Calculate annual overhead and spread it across realistic billable hours, direct costs, or revenue. The result is your allocation, not a universal contractor rate. Add profit separately and check the full price against the job scope.
How do I calculate a contractor overhead rate?
For an hourly rate, divide annual overhead by annual billable hours. For a direct-cost rate, divide annual overhead by annual direct costs. Use consistent categories and include recurring and irregular expenses.
Should I include my own time in overhead?
Include unbilled work such as scheduling and invoicing somewhere in your cost plan. Keep installation labor separate, and don’t count owner pay in both labor and overhead. Match your treatment to your books.
What does overhead per hour mean?
It’s annual overhead assigned to each billable hour. Multiply the rate by a job’s estimated hours to allocate its share. If billable hours fall, the same annual overhead is spread over fewer hours, so update the calculation.

About this page
Invocket Editorial
Written by the team that builds Invocket, an invoicing app for contractors. We check prices and rules against published sources, name them on the page, and update the page when they change. How we write and check these pages.